Projects using ODA funds:

  1. Vung Tau wastewater collection, treatment and drainage project.
    • Name of project: Vung Tau wastewater collection, treatment and drainage project.
    • Project Owner: Ba Ria – Vung Tau Urban Sewerage and Development Company;
    • Form of investment: New construction
    • Management unit: The Project Owner directly manages and implements the project
    • ODA sponsor: French Government
    • Capital source: French ODA fund and local budget.
    • Construction location: Vung Tau City.
    • Capacity:

      + 01 WWTP with the capacity of 22,000m3/day

      + 07 pumping stations

      + 28 km of various pipelines

      + 51 CSOs

Project objective: collecting all wastewater of the Southern area of the airport and convey into Rach Ba wastewater treatment plant through the collecting, conveying and receiving sewer system at CSOs, pumping stations; solving the environmental pollution with drainage system for half part of the airport’s southern area.

  • Project implementation duration: 2009- 2016.
  • Total investment: 1,132,889 million VND

      In which: Local fund: 674,285 million VND

                      ODA fund:   458,604 million VND (equivalent to 16 million EUR).

(Decision on approving the project adjustment No.2946/QĐ-UB dated 31st December 2014 of Ba Ria – Vung Tau Peoples’ Committee)

  1. Ba Ria wastewater collection and treatment project;
  • Name of project: Ba Ria wastewater collection and treatment project.
  • Project Owner: Ba Ria – Vung Tau Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management Unit: The Project Owner directly manages and implements the project.
  • ODA sponsor: Swiss Government
  • Capital source: Swiss ODA fund and local budget.
  • Construction location: Ba Ria City.
  • Capacity:

      + 01 WWTP with capacity of 12,000m3/day

      + 09 pumping stations

      + 70.8 km of various pipelines

      + 24 CSOs

- Project objective: To improve urban environmental conditions, preserve natural environment sanitation of the city, ensure about 60% of local population being served with drainage as well as prevent urban from pollution and create favorable conditions for the completion of technical infrastructure and development planning of Ba Ria City in the future.

  • Project implementation duration: 2009- 2018.

-     Total investment: 548,600 million VND (32.47 million CHF), in which:

+ Local budget: 348,576 million VND (equivalent to 20.63 million CHF),

+ ODA funds: 200,024 million VND (equivalent to 11.840 million CHF).

(Decision on approving the project adjustment No.3723/QĐ-UB dated 5th November 2009 of Ba Ria – Vung Tau Peoples’s Committee)

  1. Project on construction of wastewater collection, treatment and drainage system in Phu My new urban area, Tan Thanh District;
  • Name of project: Project for construction of wastewater collection, treatment and drainage system in Phu My new urban area, Tan Thanh District;
  • Project Owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management unit: The Project Owner directly manages and implements the project.
  • ODA sponsor: Dutch Government
  • Capital source: Dutch ODA fund and local budget.
  • Construction Location: Phu My new urban area, Tan Thanh District
  • Capacity:

      + 01 WWTP with capacity of 29,700m3/day

      + 04 pumping stations

      + 43 km of collection pipelines and 79 km of tertiary pipeline D200

      + 17,022 sets of manhole

  • Project objective: Project is invested to construct the wastewater collection, treatment and drainage system in Phu My new urban area, Tan Thanh District to improve the sanitary conditions of urban environment; contribute to improve the infrastructure; solve the environmental pollution and make the landscape of Phu My urban area clean, green, sustainable and effectively use official development assistance (ODA) funds of the Dutch Government.
  • Project implementation duration: 2013- 2018.

-     Total investment: 818,443 million Dong (equivalent to 29.189 million Euros), in which:

+ Local fund: 536.709 million VND

+ Non-refundable ODA fund of the Dutch Government: 281,734 million VND (equivalent to 10.048 million EUR).

(Decision on approving the project No.1982/QĐ-UB dated 3th September 2013 of Ba Ria – Vung Tau People’s Committee)

  1. Vung Tau wastewater collection, treatment and drainage project, phase 2;
  • Name of project: Vung Tau wastewater collection and treatment project, phase 2.
  • Project Owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management unit: The Project Owner directly manages and implements the project.
  • ODA sponsor: Spanish Government
  • Capital source: Spanish ODA fund and local budget.
  • Construction Location: in the Northern Airport, Vung Tau City.
  • Capacity:

      + 02 WWTPs with capacity of 44,000m3/day

      + 05 new pumping stations and 06 additional pumping stations of Vung Tau wastewater collection, treatment and drainage project, Vung Tau City.

      + 115 km of various pipelines

      + 1,139 inspection manholes

- Project Objectives: To invest and construct the collection, treatment and drainage system to improve environmental sanitation conditions of Vung Tau City; to solve environmental pollution in residential areas; improve people's living standards; create urban green, clean, beautiful landscape and sustainable development for Vung Tau City.

- Project implementation duration: 2013- 2018.

- Total investment: 2,139,687 million VND (78,273,601 million EUR), in which:

+ Local fund: 948,570 million VND,

+ ODA fund: 1,191,117 million VND (equivalent to 43,573,184 EUR).

  1. Long Dien wastewater collection and treatment project;
  • Name of project: Long Dien wastewater collection and treatment project, Long Dien District.
  • Project Owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management unit: The Project Owner directly manages and implements the project.
  • ODA sponsor: Spanish Government
  • Capital source: Spanish ODA fund and local budget.
  • Construction Location: Long Dien and Long Hai towns, Phuoc Tinh, Phuoc Hung and An Ngai communes,
  • Capacity:

      + 01 WWTP with capacity of 19,500m3/day

      + 11 pumping stations

      + 28 km of various pipelines and 60 km of D150 pipeline to connect household

      + 530 sets of manhole.

- Project objective: To cconstruct the wastewater collection and treatment system in Long Dien urban area, Long Dien district to treat domestic wastewater of households and producing, trading, service households into local wastewater collection and treatment network in Long Dien urban area; quickly and effectively solve drainage problem out of the residential area and treat wastewater according to sanitationary requirement; minimize environmental pollution in the residential area and service one; contribute to the development of urban infrastructure, socioeconomic growth of the district as well as the development of Long Dien urban area.

Project implementation duration: 2015- 2022.

-     Total investment: 1,161,226 million VND (41.2 million EUR), in which:

+ Local budget: 426,960 million VND

+ ODA funds: 734,266 million dong (equivalent to 26 million EURO).

(Decision on approving the project No.2952/QĐ-UB dated 31st December 2014 of Ba Ria – Vung Tau People’s Committee)

 

  1. Long Son-Go Gang wastewater collection and treatment project, Vung Tau City
  • Name of project: Long Son – Go Gang wastewater collection and treatment project, Vung Tau City.
  • Project owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management Unit: The Project Owner directly manages and implements the project.
  • ODA sponsor: Belgian Government
  • Capital source: Belgian ODA fund and local budget.
  • Construction Location: Long Son – Go Gang, Vung Tau City.
  • Capacity:

      + 03 WWTPs with capacity of 9,350m3/day

      + 10 pumping stations

      + 15 km of various pipelines

- Project objective: To treat domestic wastewater of households and producing, trading, service households into local wastewater collection and treatment network in Long Son – Go Gang area; quickly and effectively solve drainage problem out of the residential area and treat wastewater according to sanitationary requirement; minimize environmental pollution in the residential area and service one; contribute to the development of urban infrastructure, socioeconomic growth of the district as well as the development of Long Son – Go Gang area.

Project implementation duration: 2015- 2022.

-     Total investment: 639,267 million VND (equivalent to 22.636 million EUR), in which:

+ Local budget: 260,171 million VND;

+ ODA funds: 379,096 million VND (equivalent to 13,423 million EUR).

(Decision on approving the project No.2947/QĐ-UB dated 31st December 2014 of the PPC Ba Ria – Vung Tau People’s Committee)

 

Projects using local budget:

  1. Investment project on replacing Bau Sen, Bau Trung, Rach Ba, Cua Lap channels with sewer pipelines
  • Name of project: Project on replacing Bau Sen, Bau Trung, Rach Ba, Cua Lap channels with sewer pipelines
  • Project Owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management Unit: The Project Owner directly manages and implements the project.
  • Capital source: local budget.
  • Construction Location: Vung Tau City.
  • Capacity: Length of pipeline: about 5,660m including 3 phases:

+ Phase 1: 1,134m;

+ Phase 2: 2,296m;

+ Phase 3: 2,230m;

- Project objective: To complete construct the 1st grade drainage axis in Vung Tau city in order to connect 2 regulation lakes through 2 tidal sluice gates of Rach Ba and Cua Lap, contribute to absolute settlement of flooding in Vung Tau city in the prolonged heavy rains, urban pollution problem and preservation of environmental sustainability and facilitation of the development planning of Vung Tau City in the future and completion of its technical infrastructure.

Project implementation duration: 2013-2016.

-     Total investment: 339,843 million dong including 3 phases:

            + Phase 1: 73,394 million VND

            + Phase 2: 115,350 million VND

            + Phase 3: 151,098 million VND

(Decision on adjusting the project No.900/QĐ-UBND-VP dated 17th April 2013 of Ba Ria – Vung Tau People’s Committee)

 

  1. Investment project on replacement of the existing manholes with the new system for rainwater collection and odor control in the province
  • Name of project: Project on replacement of the existing manholes with the new system for rainwater collection and odor control in the province.
  • Project owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management unit: The Project Owner directly manages and implements the project.
  • Capital source: local budget.
  • Construction Location: Ba Ria - Vung Tau Province.

-  Capacity: (after adjustment): 17,270 sets of manhole.

-   Project objective: To protect the health of urban residential community, contribute to improve street landscape, enhance sustainability of urban infrastructure and ensure good drainage for the urban areas.

-   Project implementation duration: 2008- 2015.

-   Total investment (after adjustment): 209,444 million VND

      (The decision on adjusting the scale and total investment of the project No.893/QĐ-TN&PTĐT-KTKH of Ba Ria –Vung Tau Urban Sewerage and Development Company dated 16th September 2014)

  1. Investment project on construction of the drainage system on Thuy Van Street (the section from Hoang Hoa Tham Street to Phan Chu Trinh Street)
  • Name of project: drainage system on Thuy Van Street with the section from Hoang Hoa Tham Street to Phan Chu Trinh Street.
  • Project owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management unit: The Project Owner directly manages and implements the project.
  • Capital source: local budget.
  • Construction Location: Vung Tau City.

-    Capacity: about 620m of D1000 pipeline.

-   Project objective: To invest in construction of the works in order to solve the situation of stagnant water on the street in the rain that causes partial flooding and affects the traffic infrastructure, the life of the resident in this area because there have not been any drainage systems on this section of street; to develop the tourism and contribute to environmental protection, technical infrastructure completion according to the drainage planning of Vung Tau city approved by the Provincial People's Committee as well as promote socioeconomic development.

-   Project implementation duration: 2014- 2015.

-     Total investment: 7,593 million VND

(Decision on approving the project adjustment No.2490/QĐ-UBND dated 12th November of Ba Ria – Vung Tau People’s Committee)

 

  1. Investment project on construction of main sewer pipelines along the technical corridor of 51 Highway
  • Name of project: Main sewer pipelines along the technical corridor of 51 Highway
  • Project Owner: BR-VT Urban Sewerage and Development Company;
  • Form of investment: New construction
  • Management unit: The Project Owner directly manages and implements the project.
  • Capital source: local budget.
  • Construction location: Tan Thanh District.

- Scale of construction investment: Total length of pipeline is 3,026.5 m including:

      + Box culvert BxH= 2x1.6m with the length of 104.5 m;

      + Box culvert BxH = 2.5x2m with the length of 564m;

      + Box culvert BxH = 2x2.5x2m with the length of 2,320m;

      + Box culvert crossing street BxH = 2x1.6m with the length of 38m);

      + 118 sets of various manholes, 02 inlets and 02 outlets.

-   Project objective: Investment in constructing the main sewer pipelines along the technical corridor of 51 Highway to contribute to solving the drainage for the researching area from the People's Committee of Tan Thanh District to Ba Sinh canal quickly, efficiently and contribute to the completion of infrastructure, the improvement of sanitary conditions of urban environment, the settlement of environmental pollution, creation of green clean and beautiful landscape for the urban area of Tan Thanh district.

-   Project implementation duration: 2013- 2017.

-   Total investment: 157,487 million VND

(Decision on approving the project No.1285/QĐ-UBND dated 4th June of Ba Ria – Vung Tau People’s Committee)

  1. 11. Investment Project on construction of the drainage pipeline at the bottom of Big Mountain in Vung Tau City
  • Name of project: Project on construction of the drainage pipeline at the bottom of Big Mountain in Vung Tau City
  • Total investment: 7,390 million VND
  • Capital source: local budget.
  • Project implementation duration: From April/2015 to October/2015
  • Construction location: at the bottom of Big Mountain, Vung Tau project.
  • Capacity of the project: 300m
  • Project objective: Investment in constructing the water collection channel in order to contribute to flooding prevention for Vung Tau City.

 

HOTLINE

WEB LINKS

GOLDEN ACHIEVEMENTS

GALLERY

Click để xem

VIDEO CLIP

CONTACT US

  • No 6, 3/2 Street, Ward 8, Vũng Tàu City
  • (0254) 3853125; (0254) 3511103

  (0254) 3511385

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

MST: 3500614211

LOGIN

Scroll to top